Install Checklist

Install Checklist

Step 1: Pre-Installation Checks

Equipment

  1. Wireless Keyboard & Mouse (with a single USB receiver)
    OR,
    Wired Keyboard
  2. Screwdriver

Power

Wiring

If electrical and/or network wiring is required, please contact your preferred, registered electrician.

Power

Ideally, the screen will be mounted over or near the power point. Please organise capping if running an extension cord to the nearest power outlet.

Network

  1. We highly recommend using a fixed/wired network connection.
  2. If you using a WIFI/wireless connection, we recommend a signal strength of 80% or more
    If the wireless connection has a browser prompt, please ask the IT team to remove the prompt.

Whitelisting 

  1. If you are restricting web traffic by IP address, please add all Cloudflare Web Traffic IP addresses to your IP whitelist
    To learn more about the Cloudflare firewall, click here.
  2. LG SoC Displays only
    1. For LG Firmware updates, allow http://signup.lge.com
    2. Internet Uptime check for Vibe WebOS – www.google.com
    3. Internet Uptime check for LG Screen – 13.124.59.106 and 13.124.135.79 (http://lgtvonline.lge.com)

Step 2: On-site Installation

Screen Position

  1. Position the screen in the best viewable area and ensure that the screen covers the power outlets.
  2. Make sure the screen is not alongside a window with direct sunlight or is in a location that will get direct sunlight. If you have any concerns, please contact support@vibe.fyi for advice.

Install Guides

Use this link to find the relevant install guide for downloading and setting up Vibe.fyi software: https://support.vibe.fyi/portal/en/kb/hardware-software-apis

Step 3: Final checks

Before leaving the site: 
  1. Ensure that cables are hidden (using capping or tucked behind the screen)
  2. Take high-res photos of the finish mounted screen to provide us for our records
    1. Wide view to clearly show your wonderful installation of the screen in its location
    2. Screen close-ups. Front-on and from an angle
    3. Make sure the screen is turned on and showing digital signage content onscreen
    4. No people in the photos
  3. Confirm whether the screen should be left on or powered off
  4. Leave the remote control with the primary onsite contact. Do not leave with the TV as staff may turn the screen off.
  5. Remove or take any packaging with you
  6. Notify the Vibe.fyi support team that the install is complete (support@vibe.fyi) and send any photos

Example Installation Photos



    • Announcements

    • Entra (Azure) Single Sign-On

      Streamline Access with Entra Single Sign-On for Vibe.fyi. Scale effortlessly as your organisation grows and simplify user management through centralised control in Azure AD. Installation guide
    • New Infotainment Template: Free to Air TV

      Something exciting is now available for your screens! Our new “Free to Air TV” template has been released. It includes three channels to keep your displays fresh and engaging: Red Bull TV Al Jazeera CNA (Channel News Asia) Perfect for adding global news,
    • SharePoint Spreadsheet Images Now Display Perfectly

      We’ve squashed a pesky bug affecting images linked in SharePoint spreadsheets: ✅ Images in subfolders will now display correctly on your slides. ✅ Non-plain text image paths in spreadsheets are now supported, so linked visuals show up as intended. This
    • Video Templates Now Check for Missing Files

      No more silent video hiccups! If a video file is missing or hasn’t uploaded properly, you’ll now see a clear alert in the Portal. 🚨🎬 This update helps catch issues early—so you’re not left wondering why your video slide isn’t playing as expected. Just
    • No More Empty Slides After Sync in Global Locations

      We’ve patched a sneaky issue where player apps outside of New Zealand were showing blank slides 1 hour after their first sync. Now, whether you’re displaying content in Sydney, Singapore, or San Francisco—your screens will stay fresh and full of dynamic