Step 2: On-site Installation
Set up and connect your screen.
Screen Position
- Position the screen in the best viewable area
- We recommend that the screen covers the power outlets
- Make sure the screen is not next to a window or door and is not installed in direct sunlight
If you have any concerns regarding placement, please contact
support@vibe.fyi for advice.
Download and install Vibe.fyi Software
Configure the screen to reflect the local time zone.
Step 3: Completion Checklist
Before you leave the site, complete the following checks to confirm the installation is successful and ready for use.
- Test Content Playback
- Ensure your playlist or default content is displaying correctly.
- Refer to: Hardware, Software & APIs article for troubleshooting or setup guidance.
- Verify Screen Connectivity
- Confirm the screen’s online status in your Vibe Admin Console.
- Check that the correct screen name and location are visible.
- Power Settings
- Confirm whether the screen should remain powered on or be turned off after installation.
- Follow your organisation’s power management policy or client request.
- Handover Notes
- Record key details for future reference:
- Device ID
- Network type (Fixed or Wi-Fi)
- Installation date
- Location or site name
- Installation Photos
- Take high-resolution photos to assist with future support.
- Required photos:
- Location Photo: Full view of the completed installation within its environment.
- Close-up Photos: Front-on and angled shots showing connections, cabling, and screen placement.
- Final Steps
- Give the Remote Control to the primary onsite contact (do not leave it attached or stored with the screen).
- Remove all packaging and debris from the site.
- Email your photos to support@vibe.fyi to notify the Vibe Support Team that installation is complete.
Example Installation Photos

